Large-scale commercial reglazing | Leeds

945m² of glazing upgraded. One stronger building envelope.

Dortech Architectural Systems delivered a substantial replacement-glazing package for a commercial office refurbishment in Leeds, working alongside TSK Group to improve thermal performance, solar control and the building’s pathway towards EPC B.

The existing frames were retained while the underperforming insulated glass units were replaced with a carefully selected modern specification.

945m² replacement glazing
Existing frames retained
Air-conditioned office
Commercial office building in Leeds following the large-scale glazing upgrade
Large-scale glazing replacement delivered as part of a wider commercial refurbishment programme.

Project partner
TSK Group

Coordinated with the wider refurbishment team and programme.

Glazing area
945m²

A sizeable, carefully sequenced insulated-glass replacement package.

Thermal performance
2.8 → 1.27

Centre-pane U-value improvement in W/m²K.

Solar performance
0.47 → 0.35

Lower g-value while maintaining a similar daylight level.

The project challenge

Improve an occupied commercial building without replacing the complete façade.

In an air-conditioned office, glazing influences performance throughout the year. Excessive solar gain increases cooling demand during warmer periods, while poorly insulated units allow heat to escape during colder weather. The project team therefore needed a replacement specification that addressed both issues while fitting within the wider renovation works.

Dortech assessed the existing installation and developed a large-scale reglazing strategy that focused investment on the elements driving performance: the insulated glass units.

Improved building performance

Modern low-E units reduce heat loss and improve solar control across a large glazed area.

Better working environment

Similar daylight transmission is retained while unwanted solar heat gain is reduced.

Reduced energy exposure

The thermal and solar-control improvements can reduce demand on heating and cooling systems.

Replacement specification

High-performance glass selected for the existing envelope.

The new insulated glass units combine a grey body-tinted outer pane, an argon-filled cavity and a clear low-emissivity inner pane. The configuration maintains the building’s established visual character while materially improving performance.

6mmGrey body-tinted outer pane
12mmArgon-filled cavity
6mmClear low-E inner pane
Why retain the frames?

Replace what is underperforming, retain what remains serviceable.

Where the window or curtain-wall framing remains suitable, glass-only replacement can avoid unnecessary façade removal. It reduces the extent of intrusive work and allows the project team to concentrate programme, access and budget on the performance upgrade itself.

This approach depends on a competent survey, compatibility checks and careful sequencing—particularly when hundreds of square metres of glazing are being changed.

Measured specification improvement

Lower heat loss and solar gain, with daylight broadly unchanged.

Centre-pane U-value2.8 → 1.27 W/m²K

ExistingImproved insulation
Solar factor / g-value0.47 → 0.35

Existing26% less transmission
Visible light39% → 38%

ExistingSimilar daylight
Supporting EPC improvement

A practical contribution to the pathway towards EPC B.

Glazing is only one component of whole-building energy performance, but the envelope is an important part of the picture. Across 945m², the improved centre-pane U-value reduces conductive heat loss, while the lower g-value helps limit cooling demand during periods of strong solar exposure.

The new specification therefore supports the wider renovation objective without implying that a glazing change alone determines the final EPC outcome.

Indicative annual impact

Approximately £5,371 to £7,338 in modelled annual savings.

The project assessment indicated approximately £4,213 per year of heating-side savings and £1,158 to £3,125 per year of cooling-side savings, based on the stated assumptions.

Indicative only. Actual performance and savings depend on orientation, occupancy, HVAC controls, internal gains, weather, shading, maintenance, operation and energy prices. No EPC outcome or financial return is guaranteed.

Large-scale replacement glazing

Surveyed, specified and sequenced as one coordinated façade package.

Large-scale reglazing is not simply a matter of ordering glass. It requires a clear understanding of the existing system, suitable glass make-ups, tolerances, access, handling, protection, logistics and the interface with other trades. Dortech Architectural Systems brings these elements together within a single specialist package for commercial property owners, consultants and principal contractors.

Project detail

See the glazing upgrade in context.

Upper façade and replacement glazing at the Leeds commercial office
Upper façade and replacement glazing at the Leeds commercial office.
Indicative UK non-domestic energy-cost trend
Indicative UK non-domestic energy-cost trend.
Three benefits of replacing underperforming commercial glass
Three benefits of replacing underperforming commercial glass.
Planning a commercial glazing upgrade?

Talk to Dortech Architectural Systems about a building-wide replacement programme.

From early surveys and performance-led glass selection to access planning and installation, we help clients turn an ageing glazed envelope into a coordinated upgrade project.

Discuss your project