945m² of glazing upgraded. One stronger building envelope.
Dortech Architectural Systems delivered a substantial replacement-glazing package for a commercial office refurbishment in Leeds, working alongside TSK Group to improve thermal performance, solar control and the building’s pathway towards EPC B.
The existing frames were retained while the underperforming insulated glass units were replaced with a carefully selected modern specification.

Coordinated with the wider refurbishment team and programme.
A sizeable, carefully sequenced insulated-glass replacement package.
Centre-pane U-value improvement in W/m²K.
Lower g-value while maintaining a similar daylight level.
Improve an occupied commercial building without replacing the complete façade.
In an air-conditioned office, glazing influences performance throughout the year. Excessive solar gain increases cooling demand during warmer periods, while poorly insulated units allow heat to escape during colder weather. The project team therefore needed a replacement specification that addressed both issues while fitting within the wider renovation works.
Dortech assessed the existing installation and developed a large-scale reglazing strategy that focused investment on the elements driving performance: the insulated glass units.
Improved building performance
Modern low-E units reduce heat loss and improve solar control across a large glazed area.
Better working environment
Similar daylight transmission is retained while unwanted solar heat gain is reduced.
Reduced energy exposure
The thermal and solar-control improvements can reduce demand on heating and cooling systems.
High-performance glass selected for the existing envelope.
The new insulated glass units combine a grey body-tinted outer pane, an argon-filled cavity and a clear low-emissivity inner pane. The configuration maintains the building’s established visual character while materially improving performance.
Replace what is underperforming, retain what remains serviceable.
Where the window or curtain-wall framing remains suitable, glass-only replacement can avoid unnecessary façade removal. It reduces the extent of intrusive work and allows the project team to concentrate programme, access and budget on the performance upgrade itself.
This approach depends on a competent survey, compatibility checks and careful sequencing—particularly when hundreds of square metres of glazing are being changed.
Lower heat loss and solar gain, with daylight broadly unchanged.
A practical contribution to the pathway towards EPC B.
Glazing is only one component of whole-building energy performance, but the envelope is an important part of the picture. Across 945m², the improved centre-pane U-value reduces conductive heat loss, while the lower g-value helps limit cooling demand during periods of strong solar exposure.
The new specification therefore supports the wider renovation objective without implying that a glazing change alone determines the final EPC outcome.
Approximately £5,371 to £7,338 in modelled annual savings.
The project assessment indicated approximately £4,213 per year of heating-side savings and £1,158 to £3,125 per year of cooling-side savings, based on the stated assumptions.
Indicative only. Actual performance and savings depend on orientation, occupancy, HVAC controls, internal gains, weather, shading, maintenance, operation and energy prices. No EPC outcome or financial return is guaranteed.
Surveyed, specified and sequenced as one coordinated façade package.
Large-scale reglazing is not simply a matter of ordering glass. It requires a clear understanding of the existing system, suitable glass make-ups, tolerances, access, handling, protection, logistics and the interface with other trades. Dortech Architectural Systems brings these elements together within a single specialist package for commercial property owners, consultants and principal contractors.
See the glazing upgrade in context.



Talk to Dortech Architectural Systems about a building-wide replacement programme.
From early surveys and performance-led glass selection to access planning and installation, we help clients turn an ageing glazed envelope into a coordinated upgrade project.