Stop solar heat at the glass. Improve comfort at source.
Dortech Architectural Systems developed and delivered a targeted solar-control reglazing solution for Ordsall Surgery, improving patient and staff comfort while avoiding the need for a substantially more expensive air-conditioning installation.
The existing frames remained serviceable, allowing approximately 92m² of insulated glass units to be replaced without removing the complete window systems.

An occupied healthcare environment requiring careful, low-disruption delivery.
Targeted replacement of the insulated glass units within retained frames.
Approximately 67% less solar energy transmission through the glass.
Reglazing cost less than half the air-conditioning option being considered.
Patient areas and consulting rooms were overheating during summer.
South and south-west facing glazing exposed the occupied spaces to high levels of direct and late-afternoon solar gain. The client was considering air conditioning, but that would have treated heat after it had entered the building and introduced new plant, capital cost and ongoing energy demand.
Dortech reviewed the building envelope first. The survey confirmed that the existing frames were still suitable, creating a practical opportunity to upgrade the glass and reduce the cause of overheating at source.
Improved comfort
Less solar heat entering the building supports more comfortable patient and staff areas.
Avoided mechanical cooling
The passive fabric upgrade removed the immediate need for a larger air-conditioning investment.
Reduced running-cost exposure
No new cooling plant meant no additional electricity demand or maintenance burden from that option.
Saint-Gobain COOL-LITE XTREME 50/22 II.
The replacement insulated glass units were selected to combine strong solar control with useful natural light. This was essential in a healthcare setting where the objective was to reduce overheating without turning patient and consultation spaces into dark interiors.
The existing frames were retained, limiting unnecessary material replacement and reducing disruption within an operational surgery.
Reduce the heat entering the building before paying to remove it.
Air conditioning can cool an overheated room, but it does not prevent solar energy from passing through underperforming glazing. By lowering the g-value of the glass, the reglazing strategy addressed the envelope itself and reduced the heat load reaching occupied areas.
This principle can be applied at greater scale across offices, healthcare estates, schools and other commercial buildings with suitable retained frames.
A substantial reduction in solar transmission with useful daylight retained.
The glazing package cost less than half the proposed air-conditioning solution.
The client confirmed that the replacement-glass option was less than 50% of the capital cost of the cooling system then being considered. It also avoided the electricity use, maintenance requirements and future replacement obligations associated with additional mechanical plant.
The result was an envelope-led solution that improved comfort and upgraded the building’s year-round thermal performance.
Approximately 21,329 kWh less theoretical solar heat entering each year.
The project model indicated potential avoided cooling electricity demand of approximately 1,777 to 4,799 kWh per year had air conditioning otherwise been installed, together with an indicative heating-side saving of approximately £456 per year.
Indicative only. Actual performance depends on building design, occupancy, HVAC systems, operating conditions, weather, maintenance and energy costs. Figures should not be treated as guaranteed savings or financial return.
From targeted healthcare upgrades to building-wide replacement programmes.
Ordsall Surgery shows the value of investigating the glass specification before committing to larger mechanical or façade interventions. Dortech Architectural Systems applies the same survey-led, performance-focused approach to large commercial glazing projects—coordinating specification, manufacture, access, protection and installation around the needs of the occupied building.
See the glazing upgrade in context.



Talk to Dortech Architectural Systems about performance-led replacement glazing.
We can assess the existing glazed system, identify suitable upgrade options and plan a coordinated replacement programme around your building and its users.