HULL VENUE

We are delighted main contractors, BAM Construction selected Dortech to deign, manufacture and install glazing to Hulls new State-of-the-art music, events and conference centre. This distinctive building was designed by AFL Architects, from Manchester and incorporated over 600m2 of architectural glazing.

Dortech utilised Technals MX visible grid curtain wall suite, complimented with Saint Gobain Cool Lite SKN176 glass throughout this project.

Detailed feasibility studies and market testing show that the facility will inject £13.5 million into Hull’s economy annually, delivering 30 full-time jobs with 100-150 temporary jobs on event days.

The centre will include a 3,500 capacity concert auditorium, with the flexibility to reduce to a 2,500 all-seated event and a 2,000m2 exhibition space, plus an 800 capacity conference auditorium.

  • Customer: BAM Construction NE
  • Architect: AFL Architects, Manchester
  • Project: Hull Venue
  • Overall project value: £36.2m
  • Glazing System: Technal
  • Glazed Area: >600m2
  • Glass: Saint Gobain Cool Lite SKN176
  • Project Type: State-of-the-art music, events and conference centre
BIRMINGHAM CITY UNIVERSITY
SPRINGFIELD SIXTH FORM CENTRE, DEWSBURY LEARNING QUARTER